Lower Susquehanna Comprehensive Water Resources Study Phase 1 and Phase 2

Phase 1 of the study is completed. The Executive Summary pdf and Table of Contents pdf can be viewed on-line. Electronic copies of the entire report may be requested by e-mail at srbc@srbc.net or by calling (717) 238-0425.

The Phase 2 Plan of Study pdf has been developed.

SRBC Office

The Susquehanna River Basin Commission's headquarters building, situated along the Susquehanna River, serves as an example of flood resistant design with the first fully-functional floor level and all utilities elevated well above the record setting Hurricane Agnes flood of 1972.