Phase
1 of the study is completed. The Executive
Summary
and Table
of Contents
can be viewed on-line. Electronic copies of the entire
report may be requested by e-mail at srbc@srbc.net
or by calling (717) 238-0425.
The Phase
2 Plan of Study
has been developed.
The Susquehanna River Basin Commission's headquarters building, situated along the Susquehanna River, serves as an example of flood resistant design with the first fully-functional floor level and all utilities elevated well above the record setting Hurricane Agnes flood of 1972.